Difference between revisions of "Floating Offshore Wind Turbine Generator"

From MIT Technology Roadmapping
Jump to navigation Jump to search
 
(68 intermediate revisions by the same user not shown)
Line 9: Line 9:
==Roadmap Overview==
==Roadmap Overview==


[[File:Section 1.JPG]]
[[File:3FOWTG_Section1.jpg]]


Offshore wind power is a type of wind power generation that converts the power of the wind into electricity, mainly at sea or on lakes. As the global trend calls for a shift to renewable energy sources, wind power is playing an important role among them. Onshore wind power is gradually being introduced; for example, as of 2022, the cumulative global wind power capacity will reach 906 GW.
Floating Offshore Wind Turbine Generators are a technology that generates electricity by converting wind energy using turbines mounted on floating structures, which are moored to the seabed and remain stable at sea or on lakes. This technology is a form of offshore wind power, and compared to fixed systems, Floating Offshore Wind Turbine Generators can be installed in deeper waters or in coastal areas with limited space.


On the other hand, onshore wind power accounts for the majority of this capacity, with offshore wind power accounting for only 7.1%. This is because offshore wind power is a relatively new technology, and technical limitations and high costs have been the main factors that have slowed its introduction. In particular, the harsh marine environment, technical challenges in transporting electricity over long distances, and higher facility construction and maintenance costs than for onshore wind have hindered its introduction. However, with advances in technology and cost reductions, the introduction of offshore wind power has begun to gain momentum in recent years, and it is considered an important pillar of the renewable energy field in the future. In particular, countries surrounded by oceans are expected to increase their energy self-sufficiency by utilizing their abundant wind resources.
As the global shift toward renewable energy accelerates, wind power plays a central role. As of 2022, global wind power capacity has reached 906 GW, but the vast majority of this is onshore wind power, with offshore wind accounting for only 7.1%. Offshore wind power is divided into two types: "fixed" and "floating." This roadmap focuses on the latter, which is still in its early stages of development.


There are two types of offshore wind power technologies: “implantable” and “floating. The implantation type is a method in which the generator is fixed to the seabed and is usually installed in shallow water within 50 meters in depth. This method is characterized by its mature technology and its ability to achieve high power generation efficiency through the use of large, robust generators. In Europe, where there are many shallow waters, this implantation type is the mainstream. In Europe as a whole, offshore wind power is already a major source of renewable energy in many countries, with more than 50 GW of installed capacity as of 2021.
Fixed wind power involves anchoring the turbine to the seabed, usually in shallow waters up to 50 meters deep, and is a relatively mature technology. In contrast, Floating Offshore Wind Turbine Generators, which are suited for deep-water areas or countries with limited coastal space such as Japan, the U.S. West Coast, and Norway, face fewer restrictions on installation locations. However, challenges remain in terms of stability at sea, transporting electricity to land, and reducing costs. Currently, floating systems are approximately twice as expensive as fixed systems, and large-scale commercialization is expected to take time. Nevertheless, as technology advances, the adoption of Floating Offshore Wind Turbine Generators is anticipated to increase significantly in the future.
 
Floating wind turbines, on the other hand, can be used in countries with small coastal areas or in areas with deep waters, because they can be installed in deeper waters and there are fewer restrictions on where they can be installed. For example, Japan, the west coast of the United States, and Norway are candidates. Currently, the floating system is still in its technological infancy, with particular issues being stability at sea, how to transport electricity on land, and cost reduction. In fact, the cost of the floating type is said to be about twice that of the implantation type, and large-scale commercialization is expected to take time. However, as technology advances, the introduction of floating offshore wind power is expected to increase significantly in the future.
 
It is expected that technological innovation and government support measures will lead to the expansion of offshore wind power generation, including floating wind power.


==Design Structure Matrix (DSM) Allocation==
==Design Structure Matrix (DSM) Allocation==


[[File:3FOWTG_DSM.jpg]][[File:3FOWTG_Tree.jpg]]
[[File:3FOWTG_Section2.jpg]]


The 2-WTB tree in the upper right corner displays some of the key components of a wind turbine (2WTB), that when individually improved, enhance the overall performance and figures of merit of the wind turbine. The wind turbine can be broken down into its three main portions: a tower (3TWR), a nacelle (3NCL) and a rotor (3ROT). The three main wind turbine parts stand on the shoulders of other technologies, which if removed or damaged, can significantly affect the wind turbine. The tree can then be expanded into a more complex matrix that shows how most of its components are interconnected. Many of the parts are connected physically, some transfer energy, and others share information. The tree also exposes the purpose of the wind turbine itself, which is to aid in overall electricity generation or electrification (1ELE). Wind turbines can be combined into wind farms which together can replace a carbon releasing power plant.
The 3FOWTG tree that we can extract from the DSM above shows us that the Floating Offshore Wind Turbine Generator (3FOWTG) is part of a larger industry-wide initiative on "Wind Turbine Generation" (2WTG), included in a type of electrification, and that it requires the following key enabling technologies at the subsystem level: 4TUR Turbine, 4TOW Tower, 4FOU Foundation, and 4POT Power Transmission. In turn, these require enabling technologies at level 5: 5BLA Blade, 5NAC Nacelle, 5ROT Rotor, 5YAC Yaw Control, 5FLS Floating Structure (such as the structure of spar and semi-submersible), and 5CAB Cable.


==Roadmap Model using OPM==
==Roadmap Model using OPM==
Team 20 hereby displays OPD of 3FOWTG – Floating Offshore Wind Turbine Generator (WTG) This consists of level 3 decomposed WTG, associated products and figure of merit (FOM).
Team 20 hereby displays OPD of 3FOWTG – Floating Offshore Wind Turbine Generator (WTG) This consists of level 3 decomposed WTG, associated products and figure of merit (FOM).
Associated OPL is displayed below. This represents the relationships among each object shown in the OPM above.
Associated OPL is displayed below. This represents the relationships among each object shown in the OPM above.
[[File:Opl111.png|thumb|Object Process Language]]
 
[[File:Opd111.png|1000px]]
[[File:3FOWTG_Section3-1.jpg]]
[[File:3FOWTG_Section3-2.jpg]]


==Figures of Merit==
==Figures of Merit==
The table below is to show a list of FOMs of 2WTG.
The table below is to show a list of FOMs of 3FOWTG.
 
[[File:FOMlist.png|1200px]]
 
Besides defining what the FOMs are, this section of the roadmap should also contain the FOM trends over time dFOM/dt as well as some of the key governing equations that underpin the technology. Each trend over time dFOM/dt is included in the table above.
 
The table below shows an example of a key governing equation governing wind turbine generators.
 
[[File:3FOWTG_Section4-2.jpg|1200px]]
 
 
==Alignment with Company Strategic Drivers==
Our company serves as a floating offshore wind turbine generator development contractor, aiming to offer proposals to governments and power distributors interested in cost-effective wind energy solutions. The primary Figure of Merit (FOM) reflecting unit energy production cost—and, by extension, maximizing return on investment—is the Levelized Cost of Energy (LCOE). Lowering the LCOE indicates the capability to produce energy at a reduced overall cost, enhancing the project’s economic viability.
 
[[File:3FOWTG Section5-1.jpg|1000px]]
 
According to the Energy Transition Outlook 2024 (DNV, 2024), the LCOE (Levelized Cost of Energy) for floating offshore wind is the highest among types of wind power generation, standing at 290 USD/MWh as of 2024, which is more than double that of fixed offshore wind at 133 USD/MWh. However, due to increased deployment and the benefits of experiential learning, costs are expected to gradually decrease. By 2050, the global average LCOE for fixed offshore wind is projected to reach 67 USD/MWh, while that for floating offshore wind is expected to be approximately 96 USD/MWh, narrowing the difference to 45%.
 
[[File:3FOWTG Section5-2.jpg|1000px]]
 
[[File:3FOWTG Section5-3.jpg|1000px]]
 
==Positioning of Company vs. Competition==
According to the "Offshore Wind Market Report: 2023 Edition" (National Renewable Energy Laboratory (NREL), 2024), the operating capacity of floating offshore wind reached 234 MW by the end of 2023. As of October 2024, there are very few commercially operational floating offshore wind projects. Additionally, information is quite limited since FOMs such as LCOE for each project have not been disclosed. However, the main projects and the FOMs for each project, as obtained through our research, are as follows.
 
[[File:3FOWTG Section6-1.jpg|1000px]]
 
Although company-specific data is extremely limited, Figure below provides data on projected trends in each region. It shows the estimated cumulative deployment of floating offshore wind energy by country through 2029 for all projects with an announced COD in NREL's OWDB. According to this data, up to 14,186 MW may be installed by 2029, based on developer-announced CODs. Most of the deployment planned through 2029 is concentrated in the United Kingdom (4,242 MW), Italy (4,160 MW), Taiwan (1,530 MW), China (1,052 MW), and Spain (995 MW).
 
[[File:3FOWTG Section6-2.jpg|1000px]]
 
==Technical Model==
'''Technical model using equations'''
[[File:3FOWTG Section7-1.jpg|1200px]]
 
'''Sensitivity Analysis'''
[[File:3FOWTG Section7-2.jpg|1200px]]
 
'''Morphological Matrix'''
[[File:3FOWTG Section7-3.jpg|800px]]
 
'''2nd FOM'''
 
[[File:3FOWTG Section7-4.jpg|700px]]
 
==Financial Model==
The figure below contains a sample NPV analysis underlying the 2SEA roadmap. It shows the non-recurring cost (NRC) of the product development project (PDP), which includes the R&D expenditures as negative numbers. A ramp up-period of  4 years is planned with a flat revenue plateau (of 400 million per year) and a total program duration of 24 years.
 
[[File:3FOWTG Section8-1.jpg|1000px]]
 
==List of R&T Projects and Prototypes==
The three floating offshore wind foundation types are considered prominent and developed globally. The Tension Leg Platform (TLP) uses taut mooring lines for excellent stability but requires precise anchoring, making it suitable for moderate depths (30–200 m). The Semi-Submersible is a buoyant platform with multiple columns, offering flexibility across depths (30–1000 m) and easier installation, making it a scalable option. The Spar-Buoy, a tall cylindrical structure with a deep draft, provides exceptional stability in deep waters (>100 m) but involves complex transport and installation. Each type is tailored to different site conditions and project requirements.
 
The Spar-Buoy is the most widely adopted floating wind turbine foundation due to its proven stability and suitability for deep waters (>100 m), where early floating wind projects have focused. Its simple, robust design ensures minimal motion under harsh offshore conditions, making it reliable for pilot and commercial projects like Hywind Scotland. However, the Semi-Submersible is the most prominent floating wind technology for the future due to its versatility and scalability. It can operate in a wide range of water depths (30–1000 meters) and adapt to various seabed conditions, making it suitable for diverse offshore locations. Its modular design and easier towing and installation reduce costs compared to Spar-Buoys and TLPs. As the industry scales up, advancements in turbine control systems are addressing stability challenges, making Semi-Submersibles the most cost-effective and flexible choice for large-scale deployment.
 
Our team created the R&D List and Portfolio, which focuses on LCOE, especially CAPEX, as the improved FOM because wind power is a well-developed technology, and the challenge with floating offshore wind turbines lies in their high cost.
 
The portfolio shows that the currently adopted Spar-Buoy are primarily Platform Projects and Derivative Projects. The Semi-Submearsible is considered a prominent option for the future, and it is undergoing a wide range of R&D, from Breakthrough Projects to Derivative Projects. On the other hand, TLP currently faces significant challenges, leading to a predominance of early-stage R&D Projects.
 
 
[[File:3FOWTG Section9-1.jpg|400px]]
 
 
 
[[File:3FOWTG Section9-2.jpg|1000px]]
 
==Key Publications, Presentations and Patents==
 
'''A.  Pablications'''
 
'''Title:'''         Evolution of floating offshore wind platforms: A review of at-sea devices <br>
'''Authors:'''         Emma C. Edwards, Anna Holcombe, Scott Brown, Edward Ransley, Martyn Hann, Deborah Greaves<br>
'''Published by:''' Renewable and Sustainable Energy Reviews, Volume 183, 2023<br>
'''Abstract:'''     Using floating platforms to support offshore wind turbines will be necessary for many countries to reach their Net-Zero targets, since much of the wind resource is located at water depths at which fixed offshore wind turbines are uneconomic or technologically unfeasible. However, floating platforms for wind turbines are still at an early stage of development, and there are a wide range of platform designs. This paper reviews the current state-of-the-art of floating offshore wind turbine platform designs which currently have or have previously had a prototype, demonstration, or farm scale project at sea. The most common design goals for the platforms and the corresponding design features of platforms used to achieve those goals are reviewed. Past, current and projected future levelized cost of energy values for floating offshore wind are reviewed and discussed. The development of each platform design is described, including evolving design goals and resulting changes in platform features. Finally, overall trends in platform designs are discussed and divided into three phases, defined by changing goals: (i) influences from the offshore oil and gas industry, (ii) specialization to floating offshore wind, and (iii) further specialization to local environment. As a conclusion, this paper provides a comprehensive review of floating offshore wind turbine (FOWT) platform designs that have reached at least prototype or demonstration stage. It examines the evolution of platform designs, focusing on key design goals like ensuring stability and reducing costs, as well as the features used to achieve these goals. The review covers the two main platform designs deployed at farm-scale (Equinor's Hywind Spar and Principle Power's WindFloat) and an additional 20 designs at prototype/demonstration stage. The authors observe that platform designs have evolved through three main phases: initial designs influenced by oil and gas industry experience, specialization for floating offshore wind needs, and further specialization for specific local environments. The paper aims to provide an up-to-date overview of FOWT platform technology development to inform researchers, industry, and policymakers as this rapidly evolving sector continues to grow. <br>
'''Representative Drawings:'''         <br>
[[File:3FOWTG Section10-2.jpg|800px]]<br>
[[File:3FOWTG Section10-3.jpg|800px]]<br>
https://www.sciencedirect.com/science/article/pii/S1364032123002733 <br><br>
 
 
'''Title:'''         Design Optimization of Wind Turbine Support Structures—A Review <br>
'''Authors:'''          Michael Muskulus, Sebastian Schafhirt<br>
'''Published by:''' Journal of Ocean and Wind Energy (ISSN 2310-3604)<br>
'''Abstract:'''     Wind turbines are complex engineering systems, subject to highly fluctuating and irregular loads. The optimal design of wind turbines, in particular their towers, support structures and foundation systems, is a nontrivial task. Computer-aided approaches can significantly help in finding better and more economic solutions. In this short review, the challenges and possible approaches for structural optimization of wind turbines are highlighted, the existing literature is discussed, and recommendations are given for future work in this upcoming and highly relevant field of research. As a conclusion, this paper highlights that while structural optimization is well-developed for static problems, optimizing wind turbine structures poses unique challenges due to their dynamic nature, fatigue considerations, and complex environmental loads. More research is needed to develop efficient optimization methods that can handle these challenges for complete wind turbine systems.<br>
'''Representative Drawings:'''         <br>
[[File:3FOWTG Section10-1.jpg|300px]]<br>
http://publications.isope.org/jowe/jowe-01-1/JOWE-01-1-p012-jcr10-Muskulus.pdf <br><br>
 
 
'''B.  Patents'''
 
'''Name:'''         CONTROLLING MOTIONS OF FLOATING WIND TURBINES <br>
'''Patent #:''' US 2015/0354532 A1<br>
'''Inventors:''' NIELSEN FINN GUNNAR [NO]; SKAARE BJØRN [NO] <br>
'''Assignee:''' STATOIL PETROLEUM AS [NO] <br>
'''Date:''' Dec 10, 2015<br>
'''Abstract:''' A motion controller for a floating wind turbine with a plurality of rotor blades, is arranged to control a motion of the floating wind turbine in a yaw direction. The controller adjusts the blade pitch of each rotor blade so as to create a net force to control the motions. The controller includes a control action which is proportional to a yaw offset angle and/or a control action which is proportional to an integral of the yaw offset angle. <br>
'''Representative Drawings:'''         <br>
[[File:3FOWTG Section10-4.jpg|800px]]<br>
https://worldwide.espacenet.com/patent/search/family/047682334/publication/US2015354532A1?q=pn%3DUS2015354532A1 <br><br>


[[File:FOMlist.png|1000px]]
'''Name:'''         Floating wind turbine installation <br>
'''Patent #:''' US 7,819,073 B2<br>
'''Inventors:''' SVEEN DAGFINN [NO]; NIELSEN FINN GUNNAR [NO]; HANSON TOR DAVID [NO] <br>
'''Assignee:''' NORSK HYDRO AS [NO] <br>
'''Date:''' OCt 26, 2010<br>
'''Abstract:''' A method for coordinating a floating wind turbine installation. The wind turbine installation includes a buoyant body (1), a tower (2) arranged over the buoyant body, a generator (3) mounted on the tower which is rotatable in relation to the wind direction and fitted with a wind rotor (4), and an anchor line arrangement (5) connected to anchors or anchor points on the sea bed. Static heeling, &phgr;s—max, at full wind load on the wind turbine is as low as possible, but preferably less than 8 degrees, and all eigenperiods for the installation are outside the waves' period range. The eigenperiod in pitch, T05 (roll, T04), is preferably less than 80% of the T03 eigenperiod in heave. Moreover, the ratio between T03 and T05 is not close to 0.5 or 1. <br>
'''Representative Drawings:'''         <br>
[[File:3FOWTG Section10-5.jpg|800px]]<br>
https://worldwide.espacenet.com/patent/search/family/035295270/publication/US7819073B2?q=CA2609745C <br><br>


The unit cost, and capacity per wind turbine are both extremely important figures of merit. When looking into what wind turbine to buy, these would influence which brand and model should be purchased. While one wind turbine may be significantly cheaper than another, the capacity of a more expensive turbine might be much greater. It is also important to consider the availability of the turbine. This is essentially average hours of operation due to unfavorable wind conditions. There is a range of wind speeds any turbine can operate at, from the cut in wind speed at the lower end of the range, to the maximum safe operating speed at the high end. The region in which a wind turbine is assembled affects the availability of the turbine, but by expanding the operational wind speeds, the availability can be increased.
==Technology Strategy Statement==
A technology roadmap should conclude and be summarized by both a written statement that summarizes the technology strategy coming out of the roadmap as well as a graphic that shows the key R&D investments, targets and a vision for this technology (and associated product or service) over time. For the 2SEA roadmap the statement could read as follows and is displayed in an Arrow Chart:


Furthermore, a couple of detail FOM with related formula and relationship is shown in the table below.
'''Our target is to develop a new solar-powered and electrically-driven UAV as a HAPS service platform with an Entry-into-Service date of 2030. To achieve the target of an endurance of 500 days and useful payload of 10 kg we will invest in two R&D projects. The first is a flight demonstrator with a first flight by 2027 to demonstrate a full-year aloft (365 days) at an equatorial latitude with a payload of 10 kg. The second project is an accelerated development of Li-S batteries with our partner XYZ with a target lifetime performance of 500 charge-discharge cycles by 2027. This is an enabling technology to reach our 2030 technical and business targets.'''


[[File:Fomwind102.png|1000px]]
[[File:3FOWTG Section11-1.jpg|400px]]

Latest revision as of 01:16, 23 November 2024

Technology Roadmap Sections and Deliverables

Team 20 is to present a "level 3” roadmap of Floating Offshore Wind Turbine Generators. The following code is the identifier.

  • 3FOWTG - Floating Offshore Wind Turbine Generator


Roadmap Overview

3FOWTG Section1.jpg

Floating Offshore Wind Turbine Generators are a technology that generates electricity by converting wind energy using turbines mounted on floating structures, which are moored to the seabed and remain stable at sea or on lakes. This technology is a form of offshore wind power, and compared to fixed systems, Floating Offshore Wind Turbine Generators can be installed in deeper waters or in coastal areas with limited space.

As the global shift toward renewable energy accelerates, wind power plays a central role. As of 2022, global wind power capacity has reached 906 GW, but the vast majority of this is onshore wind power, with offshore wind accounting for only 7.1%. Offshore wind power is divided into two types: "fixed" and "floating." This roadmap focuses on the latter, which is still in its early stages of development.

Fixed wind power involves anchoring the turbine to the seabed, usually in shallow waters up to 50 meters deep, and is a relatively mature technology. In contrast, Floating Offshore Wind Turbine Generators, which are suited for deep-water areas or countries with limited coastal space such as Japan, the U.S. West Coast, and Norway, face fewer restrictions on installation locations. However, challenges remain in terms of stability at sea, transporting electricity to land, and reducing costs. Currently, floating systems are approximately twice as expensive as fixed systems, and large-scale commercialization is expected to take time. Nevertheless, as technology advances, the adoption of Floating Offshore Wind Turbine Generators is anticipated to increase significantly in the future.

Design Structure Matrix (DSM) Allocation

3FOWTG Section2.jpg

The 3FOWTG tree that we can extract from the DSM above shows us that the Floating Offshore Wind Turbine Generator (3FOWTG) is part of a larger industry-wide initiative on "Wind Turbine Generation" (2WTG), included in a type of electrification, and that it requires the following key enabling technologies at the subsystem level: 4TUR Turbine, 4TOW Tower, 4FOU Foundation, and 4POT Power Transmission. In turn, these require enabling technologies at level 5: 5BLA Blade, 5NAC Nacelle, 5ROT Rotor, 5YAC Yaw Control, 5FLS Floating Structure (such as the structure of spar and semi-submersible), and 5CAB Cable.

Roadmap Model using OPM

Team 20 hereby displays OPD of 3FOWTG – Floating Offshore Wind Turbine Generator (WTG) This consists of level 3 decomposed WTG, associated products and figure of merit (FOM). Associated OPL is displayed below. This represents the relationships among each object shown in the OPM above.

3FOWTG Section3-1.jpg 3FOWTG Section3-2.jpg

Figures of Merit

The table below is to show a list of FOMs of 3FOWTG.

FOMlist.png

Besides defining what the FOMs are, this section of the roadmap should also contain the FOM trends over time dFOM/dt as well as some of the key governing equations that underpin the technology. Each trend over time dFOM/dt is included in the table above.

The table below shows an example of a key governing equation governing wind turbine generators.

3FOWTG Section4-2.jpg


Alignment with Company Strategic Drivers

Our company serves as a floating offshore wind turbine generator development contractor, aiming to offer proposals to governments and power distributors interested in cost-effective wind energy solutions. The primary Figure of Merit (FOM) reflecting unit energy production cost—and, by extension, maximizing return on investment—is the Levelized Cost of Energy (LCOE). Lowering the LCOE indicates the capability to produce energy at a reduced overall cost, enhancing the project’s economic viability.

3FOWTG Section5-1.jpg

According to the Energy Transition Outlook 2024 (DNV, 2024), the LCOE (Levelized Cost of Energy) for floating offshore wind is the highest among types of wind power generation, standing at 290 USD/MWh as of 2024, which is more than double that of fixed offshore wind at 133 USD/MWh. However, due to increased deployment and the benefits of experiential learning, costs are expected to gradually decrease. By 2050, the global average LCOE for fixed offshore wind is projected to reach 67 USD/MWh, while that for floating offshore wind is expected to be approximately 96 USD/MWh, narrowing the difference to 45%.

3FOWTG Section5-2.jpg

3FOWTG Section5-3.jpg

Positioning of Company vs. Competition

According to the "Offshore Wind Market Report: 2023 Edition" (National Renewable Energy Laboratory (NREL), 2024), the operating capacity of floating offshore wind reached 234 MW by the end of 2023. As of October 2024, there are very few commercially operational floating offshore wind projects. Additionally, information is quite limited since FOMs such as LCOE for each project have not been disclosed. However, the main projects and the FOMs for each project, as obtained through our research, are as follows.

3FOWTG Section6-1.jpg

Although company-specific data is extremely limited, Figure below provides data on projected trends in each region. It shows the estimated cumulative deployment of floating offshore wind energy by country through 2029 for all projects with an announced COD in NREL's OWDB. According to this data, up to 14,186 MW may be installed by 2029, based on developer-announced CODs. Most of the deployment planned through 2029 is concentrated in the United Kingdom (4,242 MW), Italy (4,160 MW), Taiwan (1,530 MW), China (1,052 MW), and Spain (995 MW).

3FOWTG Section6-2.jpg

Technical Model

Technical model using equations

3FOWTG Section7-1.jpg

Sensitivity Analysis

3FOWTG Section7-2.jpg

Morphological Matrix

3FOWTG Section7-3.jpg

2nd FOM

3FOWTG Section7-4.jpg

Financial Model

The figure below contains a sample NPV analysis underlying the 2SEA roadmap. It shows the non-recurring cost (NRC) of the product development project (PDP), which includes the R&D expenditures as negative numbers. A ramp up-period of 4 years is planned with a flat revenue plateau (of 400 million per year) and a total program duration of 24 years.

File:3FOWTG Section8-1.jpg

List of R&T Projects and Prototypes

The three floating offshore wind foundation types are considered prominent and developed globally. The Tension Leg Platform (TLP) uses taut mooring lines for excellent stability but requires precise anchoring, making it suitable for moderate depths (30–200 m). The Semi-Submersible is a buoyant platform with multiple columns, offering flexibility across depths (30–1000 m) and easier installation, making it a scalable option. The Spar-Buoy, a tall cylindrical structure with a deep draft, provides exceptional stability in deep waters (>100 m) but involves complex transport and installation. Each type is tailored to different site conditions and project requirements.

The Spar-Buoy is the most widely adopted floating wind turbine foundation due to its proven stability and suitability for deep waters (>100 m), where early floating wind projects have focused. Its simple, robust design ensures minimal motion under harsh offshore conditions, making it reliable for pilot and commercial projects like Hywind Scotland. However, the Semi-Submersible is the most prominent floating wind technology for the future due to its versatility and scalability. It can operate in a wide range of water depths (30–1000 meters) and adapt to various seabed conditions, making it suitable for diverse offshore locations. Its modular design and easier towing and installation reduce costs compared to Spar-Buoys and TLPs. As the industry scales up, advancements in turbine control systems are addressing stability challenges, making Semi-Submersibles the most cost-effective and flexible choice for large-scale deployment.

Our team created the R&D List and Portfolio, which focuses on LCOE, especially CAPEX, as the improved FOM because wind power is a well-developed technology, and the challenge with floating offshore wind turbines lies in their high cost.

The portfolio shows that the currently adopted Spar-Buoy are primarily Platform Projects and Derivative Projects. The Semi-Submearsible is considered a prominent option for the future, and it is undergoing a wide range of R&D, from Breakthrough Projects to Derivative Projects. On the other hand, TLP currently faces significant challenges, leading to a predominance of early-stage R&D Projects.


3FOWTG Section9-1.jpg


3FOWTG Section9-2.jpg

Key Publications, Presentations and Patents

A. Pablications

Title: Evolution of floating offshore wind platforms: A review of at-sea devices
Authors: Emma C. Edwards, Anna Holcombe, Scott Brown, Edward Ransley, Martyn Hann, Deborah Greaves
Published by: Renewable and Sustainable Energy Reviews, Volume 183, 2023
Abstract: Using floating platforms to support offshore wind turbines will be necessary for many countries to reach their Net-Zero targets, since much of the wind resource is located at water depths at which fixed offshore wind turbines are uneconomic or technologically unfeasible. However, floating platforms for wind turbines are still at an early stage of development, and there are a wide range of platform designs. This paper reviews the current state-of-the-art of floating offshore wind turbine platform designs which currently have or have previously had a prototype, demonstration, or farm scale project at sea. The most common design goals for the platforms and the corresponding design features of platforms used to achieve those goals are reviewed. Past, current and projected future levelized cost of energy values for floating offshore wind are reviewed and discussed. The development of each platform design is described, including evolving design goals and resulting changes in platform features. Finally, overall trends in platform designs are discussed and divided into three phases, defined by changing goals: (i) influences from the offshore oil and gas industry, (ii) specialization to floating offshore wind, and (iii) further specialization to local environment. As a conclusion, this paper provides a comprehensive review of floating offshore wind turbine (FOWT) platform designs that have reached at least prototype or demonstration stage. It examines the evolution of platform designs, focusing on key design goals like ensuring stability and reducing costs, as well as the features used to achieve these goals. The review covers the two main platform designs deployed at farm-scale (Equinor's Hywind Spar and Principle Power's WindFloat) and an additional 20 designs at prototype/demonstration stage. The authors observe that platform designs have evolved through three main phases: initial designs influenced by oil and gas industry experience, specialization for floating offshore wind needs, and further specialization for specific local environments. The paper aims to provide an up-to-date overview of FOWT platform technology development to inform researchers, industry, and policymakers as this rapidly evolving sector continues to grow.
Representative Drawings:
3FOWTG Section10-2.jpg
3FOWTG Section10-3.jpg
https://www.sciencedirect.com/science/article/pii/S1364032123002733


Title: Design Optimization of Wind Turbine Support Structures—A Review
Authors: Michael Muskulus, Sebastian Schafhirt
Published by: Journal of Ocean and Wind Energy (ISSN 2310-3604)
Abstract: Wind turbines are complex engineering systems, subject to highly fluctuating and irregular loads. The optimal design of wind turbines, in particular their towers, support structures and foundation systems, is a nontrivial task. Computer-aided approaches can significantly help in finding better and more economic solutions. In this short review, the challenges and possible approaches for structural optimization of wind turbines are highlighted, the existing literature is discussed, and recommendations are given for future work in this upcoming and highly relevant field of research. As a conclusion, this paper highlights that while structural optimization is well-developed for static problems, optimizing wind turbine structures poses unique challenges due to their dynamic nature, fatigue considerations, and complex environmental loads. More research is needed to develop efficient optimization methods that can handle these challenges for complete wind turbine systems.
Representative Drawings:
3FOWTG Section10-1.jpg
http://publications.isope.org/jowe/jowe-01-1/JOWE-01-1-p012-jcr10-Muskulus.pdf


B. Patents

Name: CONTROLLING MOTIONS OF FLOATING WIND TURBINES
Patent #: US 2015/0354532 A1
Inventors: NIELSEN FINN GUNNAR [NO]; SKAARE BJØRN [NO]
Assignee: STATOIL PETROLEUM AS [NO]
Date: Dec 10, 2015
Abstract: A motion controller for a floating wind turbine with a plurality of rotor blades, is arranged to control a motion of the floating wind turbine in a yaw direction. The controller adjusts the blade pitch of each rotor blade so as to create a net force to control the motions. The controller includes a control action which is proportional to a yaw offset angle and/or a control action which is proportional to an integral of the yaw offset angle.
Representative Drawings:
3FOWTG Section10-4.jpg
https://worldwide.espacenet.com/patent/search/family/047682334/publication/US2015354532A1?q=pn%3DUS2015354532A1

Name: Floating wind turbine installation
Patent #: US 7,819,073 B2
Inventors: SVEEN DAGFINN [NO]; NIELSEN FINN GUNNAR [NO]; HANSON TOR DAVID [NO]
Assignee: NORSK HYDRO AS [NO]
Date: OCt 26, 2010
Abstract: A method for coordinating a floating wind turbine installation. The wind turbine installation includes a buoyant body (1), a tower (2) arranged over the buoyant body, a generator (3) mounted on the tower which is rotatable in relation to the wind direction and fitted with a wind rotor (4), and an anchor line arrangement (5) connected to anchors or anchor points on the sea bed. Static heeling, &phgr;s—max, at full wind load on the wind turbine is as low as possible, but preferably less than 8 degrees, and all eigenperiods for the installation are outside the waves' period range. The eigenperiod in pitch, T05 (roll, T04), is preferably less than 80% of the T03 eigenperiod in heave. Moreover, the ratio between T03 and T05 is not close to 0.5 or 1.
Representative Drawings:
3FOWTG Section10-5.jpg
https://worldwide.espacenet.com/patent/search/family/035295270/publication/US7819073B2?q=CA2609745C

Technology Strategy Statement

A technology roadmap should conclude and be summarized by both a written statement that summarizes the technology strategy coming out of the roadmap as well as a graphic that shows the key R&D investments, targets and a vision for this technology (and associated product or service) over time. For the 2SEA roadmap the statement could read as follows and is displayed in an Arrow Chart:

Our target is to develop a new solar-powered and electrically-driven UAV as a HAPS service platform with an Entry-into-Service date of 2030. To achieve the target of an endurance of 500 days and useful payload of 10 kg we will invest in two R&D projects. The first is a flight demonstrator with a first flight by 2027 to demonstrate a full-year aloft (365 days) at an equatorial latitude with a payload of 10 kg. The second project is an accelerated development of Li-S batteries with our partner XYZ with a target lifetime performance of 500 charge-discharge cycles by 2027. This is an enabling technology to reach our 2030 technical and business targets.

File:3FOWTG Section11-1.jpg