''Note: This sample technology roadmap is taken from the example provided in Chapter 8 of the book. For the full discussion, see the Chapter. This page is meant only as an example of how the sections of your team's technology roadmap should be organized and formatted on this XLP. ''
 


=Technology Roadmap Sections and Deliverables=
=Technology Roadmap Sections and Deliverables=


This is a technology roadmap for:  
This is a technology roadmap for:  
* '''4GEN - In-situ Energy Generation'''
* '''3WEC - Wave Energy Conversion'''
 
This is a “Level 4” roadmap, indicating that it addresses a technology at the subsystem component level. Higher level roadmaps related to this subject would address technology progression at the market level (Ocean Exploration), product level (AUV), and subsystem level (Power System).


This is a “Level 3” roadmap, indicating that it addresses a technology at the subsystem level. Higher level roadmaps related to this subject would address technology progression at the market level (AUV Docking Station) and product level (Electricity Generation & Management).


==Roadmap Overview==
==Roadmap Overview==
Autonomous underwater vehicles (AUVs) are widely used to make observations and make sense of the ocean without the limitation of requiring a human-in-the-loop to function. Despite advancements in battery and other energy storage technologies, power availability remains a key limiting factor for many AUVs. Power constraints limit payload capabilities, reduce design trade space for key functions like communication and navigation, and restrict the reach of AUVs by reducing mission durations and preventing access to remote areas of the ocean. Despite its austerity, the ocean offers abundant sources of environmental energy in the form of wave energy. In contrast with wind or solar energy, wave energy is always available, which makes it a good candidate for enabling persistent AUV operations.


The working principle and architecture of solar-electric aircraft is depicted in the below.
The figure below shows a notional autonomous maritime system that utilizes each of these energy sources to provide an in-situ power generation capability.
 
[[File:Section 1.JPG]]


Solar-electric aircraft are built from light-weight materials such as wood or carbon-fiber reinforced polymers (CFRP) and harvest solar energy through the photoelectric effect by bonding thin film solar cells to the surface of the main wings, and potentially the fuselage and empennage as well. The electrical energy harvested during the day is then stored in on-board chemical batteries (e.g. Lithium-Ion, Lithium-Sulfur etc…) and used for propelling the aircraft at all times, including at night. For the system to work there needs to be an overproduction of energy during the day, so that the aircraft can use the stored energy to stay aloft at night. The flight altitude of about 60,000-70,000 feet is critical to stay above the clouds and not to interfere with commercial air traffic. Depending on the length of day, i.e. the diurnal cycle which determines the number of sunshine hours per day, which itself depends on the latitude and time-of-year (seasonality) the problem is easier or harder. The reference case in the technology roadmap is an equatorial mission (latitude = zero) with 12 hours of day and 12 hours of night.
[[File:Image of AUV.png]]


==Design Structure Matrix (DSM) Allocation==
==Design Structure Matrix (DSM) Allocation==


[[File:Section 2.JPG]]
[[File:DSM AUV11.PNG|1000px]]


The 2-SEA tree that we can extract from the DSM above shows us that the Solar-Electric Aircraft (2SEA) is part of a larger company-wide initiative on electrification of flight (1ELE), and that it requires the following key enabling technologies at the subsystem level: 3CFP Carbon Fiber Polymers, 3HEP Hybrid Electric Propulsion and 3EPS Non-Propulsive Energy Management (e.g. this includes the management of the charge-discharge cycle of the batteries during the day-night cycle). In turn these require enabling technologies at level 4, the technology component level: 4CMP components made from CFRP (spars, wing box, fairings …), 4EMT electric machines (motors and generators), 4ENS energy sources (such as thin film photovoltaics bonded to flight surfaces) and 4STO (energy storage in the form of lithium-type batteries).
The 3WEC tree shown above reveals that wave energy conversion (3WEC) is an enabling technology for the Electricity Generation & Management (2PGM) subsystem on an AUV docking station (1ADS). 3WEC technology makes up the 2PGM subsystem along with with energy storage (3STO), electricity generation (3EGN), AUV recharging (3CHG), and power take off (3PTO). Enabling technologies for 3WEC are materials that can withstand the harsh ocean environment for long durations (4SWM), technologies which reduce and prevent biofouling (4BFP), design and operations techniques for adjusting to high energy events like storms (4EWA), and control software (4COS) and hardware (4COH) that optimize wave power conversion across a range of ocean conditions. Some of the 3WEC enabling technologies are shared with other Level 3 technologies, especially those having to do with operation in the ocean environment.


==Roadmap Model using OPM==
==Roadmap Model using OPM==
We provide an Object-Process-Diagram (OPD) of the 2SEA roadmap in the figure below. This diagram captures the main object of the roadmap (Solar-Electric Aircraft), its various instances including main competitors, its decomposition into subsystems (wing, battery, e-motor …), its characterization by Figures of Merit (FOMs) as well as the main processes (Flying, Recharging).
The Object-Process Diagram (OPD) in the figure below shows how the 3WEC technology is related to the AUV docking station, and the broader persistent AUV system that docking station enables. The diagram focuses on the wave energy conversion process for a point absorber type of WEC, which at its most fundamental level relies on wave-induced relative motion between two components to generate a more useful form of energy, such as pneumatic or mechanical. This undergoes a secondary conversion process to generate mechanical rotation, which drives an electricity generator. Electrical energy is stored in a battery and used to recharge a persistent AUV, which has been collecting maritime data of interest in the vicinity of the surface docking station. Figures of merit (FOM) characterizing WEC technology are also shown, as well as the ocean wave characteristics that describe the amount of available wave power. The Object-Process Language (OPL) associated with the OPD is auto-generated and is shown to the right of the OPD. It reflects the same content as the OPD in narrative form.
 
[[File:AUV OPL2.PNG|thumb]]
[[File:AUV_OPD_new.png|800px]]
 
==Figures of Merit==
Wave energy is primarily governed by the following variables:
 
* ρ: Water density[kg/m<sup>3</sup>]
* ''g'': Acceleration due to gravity [m/s<sup>2</sup>]
* ''h'': Wave height [m]
* ''T<sub>e</sub>'': Wave period [s]
 
Wave power is governed by the following equation:
 
<math>P_{wave} = \frac{\rho g^2 h^2 T_e}{6400 \pi} </math>


[[File:Section 3.JPG]]
The following table shows figures of merit (FOM) that can be used to compare wave energy converters for AUVs. Each FOM provides unique information: specific power offers insight into likely power output when integrated into a host system, conversion efficiency provides information about how much the technology can still be improved before the theoretical maximum is reached, maximum operating duration reveals how readily the technology can support persistent AUV operations, and unit cost provides insight into economic feasibility.


An Object-Process-Language (OPL) description of the roadmap scope is auto-generated and given below. It reflects the same content as the previous figure, but in a formal natural language.


[[File:Section 3_2.JPG]]
{| class="wikitable"
|-
! Figure of Merit !! Units !! Description
|-
| Specific Power || [Watts/m] || Average power output normalized by characteristic dimension of WEC
|-
| Average Power Output || [Watts] || Average power output of WEC
|-
| Characteristic Dimension || [m] || Size of WEC as it relates to drag
|-
| Hydrodynamic Efficiency || [%] || Fraction of wave energy converted into mechanical energy
|-
| Maximum Operating Duration || [days] || Average number of days WEC can continously harvest energy for
|-
| Unit cost || [$] || Cost of one WEC
|}


==Figures of Merit==
The table below show a list of FOMs by which solar electric aircraft can be assessed. The first four (shown in bold) are used to assess the aircraft itself. They are very similar to the FOMs that are used to compare traditional aircraft which are propelled by fossil fuels, the big difference being that 2SEA is essentially emissions free during flight operations. The other rows represent subordinated FOMs which impact the performance and cost of solar electric aircraft but are provided as outputs (primary FOMs) from lower level roadmaps at level 3 or level 4, see the DSM above.


[[File:Section 4_.JPG]]
The following plot shows improvements in specific power of various wave energy converters. There is not an an obvious trend, although there appears to be some improvement over time. Two qualifications to this chart:


Besides defining what the FOMs are, this section of the roadmap should also contain the FOM trends over time dFOM/dt as well as some of the key governing equations that underpin the technology. These governing equations can be derived from physics (or chemistry, biology ..) or they can be empirically derived from a multivariate regression model. The table below shows an example of a key governing equation governing (solar-) electric aircraft.
1. By normalizing power by characteristic dimension, we lose some information. Some specific powers appear large because of very small characteristic dimensions and vice versa.
2. The data points in red come from computer modeling of WEC designs, and have not been demonstrated in an ocean environment.  


[[File:Section 4_2.JPG]]
[[File:Spec power over time.png]]


==Alignment with Company Strategic Drivers==
==Alignment with Company Strategic Drivers==
The table below shows an example of potential strategic drivers and alignment of the 2SEA technology roadmap with it.
The following table shows our strategic drivers and the alignment of those drivers with this roadmap.
 
{| class="wikitable"
|-
! Number !! Strategic driver !!  Targets and Alignment
|-
| 1|| Deliver a portable offshore wave energy conversion system with enough capacity to sustain large-class (>500kg) AUV operations. || '''Target: Generate an average of 5kW of electrical power using a device with a maximum characteristic width of 5m.'''
 
We expect that a persistent AUV capable of long-duration meaningful maritime data collection will be in the largest class of AUV. The 5m characteristic width constraint was imposed based on an estimate of the largest size of device that could be transported and placed in the ocean environment without specialized equipment. The 5kW power target represents progression beyond the Pareto front for this technology, and is a rough estimation of the power required to continuously sustain two large-class AUVs using a single docking station and WEC. Increasing wave energy conversion efficiency at a deployable size is the focus of this roadmap, <span style="color:#006400">'''therefore this strategic driver is aligned with the technology roadmap.'''</span>
 
|-
| 2|| Increase the quantity of data an AUV payload collects by increasing the operating-to-docking duty cycle rate. || '''Target: AUV in collection operations 50% of the time.'''


[[File:Section 5.JPG]]
For a system comprised of one AUV associated with a single ocean surface docking station, AUV duty cycle depends on the rate of energy generation, the rate that energy can be transferred to an AUV when it is docked for energy replenishing, and the quantity of energy an AUV can store. This roadmap only addresses the rate of docking station power generation. <span style="color:#006400">'''Therefore, this strategic driver is aligned with the technology roadmap, but other technology development is required to fully achieve this strategic driver’s target.'''</span>
|-
| 3|| To provide a system capable of continuous unattended operation to enable maritime data collection in remote oceanic regions with minimal support infrastructure. || '''Target: 1 year of continuous autonomous operation.'''


The list of drivers shows that the company views HAPS as a potential new business and wants to develop it as a commercially viable (for profit) business (1). In order to do so, the technology roadmap performs some analysis - using the governing equations in the previous section - and formulates a set of FOM targets that state that such a UAV needs to achieve an endurance of 500 days (as opposed to the world record 26 days that was demonstrated in 2018) and should be able to carry a payload of 10 kg. The roadmap confirms that it is aligned with this driver. This means that the analysis, technology targets, and R&D projects contained in the roadmap (and hopefully funded by the R&D budget) support the strategic ambition stated by driver 1. The second driver, however, which is to use the HAPS program as a platform for developing an autonomy stack for both UAVs and satellites, is not currently aligned with the roadmap.
Our roadmap focuses on increasing the efficiency with which wave power can be converted to useful power. This objective will result in the incorporation of new wave energy transfer technologies that are untested over extended operations. Additionally, this roadmap does not address potential maritime-specific failure mechanisms like biofouling or extreme weather. The technology tree and associated DSM shown earlier in the roadmap described how the 4SWM, 4BFP, and 4EWA enabling technologies contribute to other Level 3 technologies adjacent to the 3WEC technology that is the focus of this roadmap. Improving these Level 4 technologies would contribute to increased reliability over a longer operating duration for all aspects of an AUV docking station, as they seek to counter degradation caused by the harsh ocean environment. <span style="color:#990000">'''Therefore, this strategic driver is not aligned with the technology roadmap.'''</span>
|}
 
As the table shows, the roadmap for wave energy conversion technology is not sufficient by itself to enable a reliable offshore power source for long-duration unattended AUV maritime data collection operations.


==Positioning of Company vs. Competition==
==Positioning of Company vs. Competition==
The figure below shows a summary of other electric and solar-electric aircraft from public data.


[[File:Section 6.JPG]]
There are a wide variety of heaving buoy wave energy converters. The table below summarizes the key data points about each model.
 
<gallery>
PowerBuoy.png|Powerbuoy
DEXA.png|DEXA
Lifesaver1.png|Lifesaver
RM3a.png|RM3
Wavebob.png|Wavebob
</gallery>
 


The aerobatic aircraft Extra 330LE by Siemens currently has the world record for the most powerful flight certified electric motor (260kW). The Pipistrel Alpha Electro is a small electric training aircraft which is not solar powered, but is in serial production. The Zephyr 7 is the previous version of Zephyr which established the prior endurance world record for solar-electric aircraft (14 days) in 2010. The Solar Impulse 2 was a single-piloted solar-powered aircraft that circumnavigated the globe in 2015-2016 in 17 stages, the longest being the one from Japan to Hawaii (118 hours).  
{| class="wikitable sortable"
|-
! Name !! Hydrodynamic Efficiency (%) !! Characteristic Dimension (m) !! Average Power (kW) !! Year
|-
| '''Point Absorber''' || 14 || 125 || 28 || 2002 
|-
| '''DWP System''' || 20 || 10 || 3.2 || 2002
|-
| '''AquaEnergy''' || 18 || 6 || 1.9 || 2004
|-
| '''INRI/SEADOG''' || 19.25 || 5.7 || 1.9 || 2004
|-
| '''Wavebob''' || 45.5 || 15 || 12.8 || 2004
|-
| '''Small bottom-referenced heaving buoy (SBHB)''' || 3.75 || 3 || .2 || 2012
|-
| '''Floating two-body heaving converter (FTHC)''' || 29.75 || 20 || 15 || 2012
|-
| '''Bottom-fixed heave-buoy array (BHA)''' || 14.75 || 5 || 1.6 || 2012
|-
| '''Floating heave-buoy array (FHA)''' || 9.75 || 8 || 3.2 || 2012
|-
| '''Two-body heaving device (THD)''' || 25 || 15 || 11.6 || 2012
|-
| '''Lifesaver''' || 12 || 12.5 || 3.9 || 2014
|-
| '''RM3''' || 16 || 20 || 11 || 2013
|-
| '''DEXA''' || 8 || 22 ||  4.6 || 2012
|-
| '''Powerbuoy'''  || 44 || 1.5 || 1.2 || 2017 ||
|}


SolarEagle  and Solara 50 were both very ambitious projects that aimed to launch solar-electric aircraft with very aggressive targets (endurace up to 5 years) and payloads up to 450 kg. Both of these projects were canceled prematurely. Why is that?
Below, we can see two of our FOMs compared graphically. We show two series. The red line shows actual heaving wave energy converter prototypes tested in actual ocean conditions, whereas the blue line shows numerical analysis using modeling equations. The two data series generally agree about the current performance of heaving WECs.  


[[File:Section 6_2.JPG]]
In accordance with strategic driver 1, we want to shift the Pareto front to the top left, where we get more power with a smaller form factor (lower characteristic dimension).  


The Pareto Front (see Chapter 5, Figure 5-20 for a definition) shown in black in the lower left corner of the graph shows the best tradeoff between endurance and payload for actually achieved electric flights by 2017. The Airbus Zephyr, Solar Impulse 2 and Pipistrel Alpha Electro all have flight records that anchor their position on this FOM chart. It is interesting to note that Solar Impulse 2 overheated its battery pack during its longest leg in 2015-2016 and therefore pushed the limits of battery technology available at that time.  We can now see that both Solar Eagle in the upper right and Solara 50 were chasing FOM targets that were unachievable with the technology available at that time. The progression of the Pareto front shown in red corresponds to what might be a realistic Pareto Front progression by 2020. Airbus Zephyr Next Generation (NG) has already shown with its world record (624 hours endurance) that the upper left target (low payload mass - about 5-10 kg and high endurance of 600+ hours) is feasible. There are currently no plans for a Solar Impulse 3,  which could be a non-stop solar-electric circumnavigation with one pilot (and an autonomous co-pilot) which would require a non-stop flight of about 450 hours. A next generation E-Fan aircraft with an endurance of about 2.5 hours (all electric) also seems within reach for 2020. Then in green we set a potentially more ambitious target Pareto Front for 2030. This is the ambition of the 2SEA technology roadmap as expressed by strategic driver 1. We see that in the upper left the Solara 50 project which was started by Titan Aerospace, then acquired by Google, then cancelled, and which ran from about 2013-2017 had the right targets for about a 2030 Entry-into-Service (EIS), not for 2020 or sooner. The target set by Solar Eagle was even more utopian and may not be achievable before 2050 according to the 2SEA roadmap.
[[File:Pareto plot.png|center]]


==Technical Model==
==Technical Model==
In order to assess the feasibility of technical (and financial) targets at the level of the 2SEA roadmap it is necessary to develop a technical model. The purpose of such a model is to explore the design tradespace and establish what are the active constraints in the system. The first step can be to establish a morphological matrix that shows the main technology selection alternatives that exist at the first level of decomposition, see the figure below.
=== Overview ===
There are various ways to convert the wave energy, and the amount of energy significantly changes depending on the wave's situation. For simplicity, we divide the model into three parts: 1)the wave energy converter (WEC) part, which converts the wave energy as mechanical, pneumatic, or potential energy, 2)the power take-off (PTO) part, which converts absorbed energy into useful mechanical energy, and 3) the generator, which transforms useful mechanical energy into electrical energy.
 
[[File:Figure7 1.png|500px|none|thumb|Basic process of wave energy conversion<ref>Wave energy conversion and hydrodynamics modeling technologies: A review, Wanan Sheng</ref>]]
As will be shown later, the wave energy converted by the WEC is determined by the significant wave height and the wave energy period, which vary with the location and season, and the characteristic dimension, which is the length that wave passes. WECs can be broadly classified into the following categories: heaving device, overtopping device, oscillating water device, oscillating wave converter, and others. Each type of WEC includes those whose structures are fixed to the seabed or the shore, floating, and submerged in the water. By adding the secondary and tertiary conversion options to the above information Morphological Matrix and Tradespace are shown as follows. Again, the first two variables have varying expected values depending on location and season, and that the secondary and tertiary conversions are outside the scope of this roadmap.
 
[[File:Figure72revrevrev.png|1110px|none|thumb|Morphological Matrix and Tradespace]]
The image of each WEC type is as follows. The choices shown as ellipses in the matrix correspond to each type.
 
[[File:Figure7 3.png|800px|none|thumb|Illustration of the archetypal wave energy device for each category<ref name="database">A database of capture width ratio of wave energy converters, A.Babarit</ref>]]
The coefficients affecting the energy conversion efficiency by WEC type differ as follows. In this roadmap, we focus on the mathematical model of the having device to deepen the discussion.
[[File:Figure7 4.png|800px|none|thumb|HYDRODYNAMIC EFFICIENCY COEFFICIENTS<ref name="scoping">A Scoping Study to Determine the Location-Specific WEC Threshold Size for Wave-Powered AUV Recharging, Blake P. Driscol, L. Andrew Gish, and Ryan G. Coe</ref>]]
 
=== Mathematical Modeling ===
'''Some important variables:'''
* B = Characteristic Dimension [m]
* A = Maximum Horizontal Cross-sectional Area of the WEC device [m^2]
* H = Significant Wave Hight [m]
* T = Wave Energy (mean) Period [seconds]
* η = Hydrodynamic Efficiency [%]
* ρ = Water Density [kg/m^3] (≈1000 kg/m^3 )
* g = Gravitational Constant [m/s^2] (≈ 9.81 m/s^2)
 
'''Key equations:'''<br>
[[File:Figure7 5.png|250px]]<br>
Assuming that we use the heaving device, which has a spherical floating device, the power converted by the WEC is given by<ref name="database" />:
[[File:Figure7.png|500px|center|key]]
<br>
 
Also, based on Budal’s limit, the upper theoretical limit for power generation is given by<ref name="scoping" />:
[[File:Figure7 7.png|300px|center|]]


[[File:Section 7_.JPG]]
=== Sensitivity Analysis ===
[[File:図1.png|700px|center|]]<br>
<br>


It is interesting to note that the architecture and technology selections for the three aircraft (Zephyr, Solar Impulse 2 and E-Fan 2.0) are quite different. While Zephyr uses lithium-sulfur batteries, the other two use the more conventional lithium-ion batteries. Solar Impulse uses the less efficient (but more affordable) single cell silicon-based PV, while Zephyr uses specially manufactured thin film multi-junction cells and so forth.
[[File:図2.png|700px|center|]]


The technical model centers on the E-range and E-endurance equations and compares different aircraft sizing (e.g. wing span, engine power, battery capacity) taking into account aerodynamics, weights and balance, the performance of the aircraft and also its manufacturing cost. It is important to use Multidisciplinary Design Optimization (MDO) when selecting and sizing technologies in order to get the most out of them and compare them fairly (see below).
==Key Publications and Patents==


[[File:Section 7_2.JPG]]
Key publications and patents are listed below. The listed publications were used to understand current wave energy convertor performance, review modeling methodologies for AUV recharging using wave energy, and determine how this roadmap's technology could be used in a market application. The patents listed represent the first document instance of this type of wave energy conversion technology, as well as several incremental improvement features to increase efficiency and utility.
 
===Publications===
 
* '''Babarit, Aurélien. "A database of capture width ratio of wave energy converters." ''Renewable Energy'' 80 (2015): 610-628.''' ''Executive Summary'': Comprehensive compilation of wave energy convertor performance scaled to device characteristic width. Establishes wave energy extraction performance by convertor type and device characteristic width using data regression.
 
* '''Aderinto, Tunde, and Hua Li. "Review on power performance and efficiency of wave energy converters." ''Energies'' 12.22 (2019): 4329.''' ''Executive Summary'': Review and comparison of reported hydrodynamic efficiencies and power performance of wave energy convertors across a range of convertor types and sizes. The analysis concludes that the oscillating body type of wave energy convertor currently has the highest efficiencies, and that efficiency can be further improved by matching the conversion system dynamics to local wave conditions to maximize power output.
 
* '''Driscol, Blake P., L. Andrew Gish, and Ryan G. Coe. "A Scoping Study to Determine the Location-Specific WEC Threshold Size for Wave-Powered AUV Recharging." ''IEEE Journal of Oceanic Engineering'' (2020).''' ''Executive Summary'': Feasibility analysis of wave energy in a AUV recharging application using reported wave energy convertor performance and observed ocean wave energy data. The study concludes there is sufficient available wave energy in the studied locations to support AUV recharging operations using modestly-sized wave energy convertors.
 
* '''LiVecchi, A., et al. "Powering the blue economy; exploring opportunities for marine renewable energy in maritime markets." ''US Department of Energy, Office of Energy Efficiency and Renewable Energy''. Washington, DC (2019): 207.''' ''Executive Summary'': United States Department of Energy report exploring scientific, military, and commercial markets where marine energy may be uniquely suited to meet market needs. The report explores opportunities and potential applications of one such market—underwater vehicle recharging—which is expected to double by 2022.
 
===Patents===
*'''Gehre, Max. (1899). US Patent No US628457A. “Device for producing electric currents at sea by the action of waves” available on https://patents.google.com/patent/US628457A.''' ''Executive Summary'': The first known US patent for a heaving point absorber type of wave energy convertor that generates electricity at the wave site. The simple device uses a simple float to induce electrical current through one-dimensional motion between a series of magnets and an induction coil.
 
*'''Dick, William, (2001). US Patent No US6857266B2. “Wave energy convertor” available on https://patents.google.com/patent/US6857266B2.''' ''Executive Summary'': The described device is for a typical heaving point absorber type of wave energy convertor that includes the novel feature of being able to variably tune the oscillation device to match the wave period, a key current research area of wave energy conversion technology.
 
*'''Foster, Graham and Stockman, Gareth, (2009). US Patent No US8826658B2. “Wave powered generator” available on https://patents.google.com/patent/US8826658B2.''' ''Executive Summary'': A patent for a point absorber type of wave energy conversion device that incorporates features that make each convertor more easily transportable, such as an inflatable float and non-rigid connectors between pieces of the device.
<gallery>
WEC Patent1.PNG|First patented point absorber WEC (Gehre/1899) <ref>https://patents.google.com/patent/US628457A/en?oq=US628457A</ref>
WEC Patent2.PNG|Modern point absorber WEC design with tuning capability (Dick/2001) <ref>https://patents.google.com/patent/US6857266B2</ref>
WECPatent3.PNG|Point absorber WEC concept designed for transportability and durability (Foster & Stockman/2009) <ref>https://patents.google.com/patent/US8826658B2/en?oq=US8826658B2</ref>
</gallery>


==Financial Model==
==Financial Model==
The figure below contains a sample NPV analysis underlying the 2SEA roadmap. It shows the non-recurring cost (NRC) of the product development project (PDP), which includes the R&D expenditures as negative numbers. A ramp up-period of  4 years is planned with a flat revenue plateau (of 400 million per year) and a total program duration of 24 years.


[[File:Section 8.JPG]]
===Baseline Case===
Our project’s financial model calculates the net present value (NPV) of the total project over an assumed 20-year project duration. The lack of public financial information in the wave energy sector coupled with the currently nonexistent wave-energy-for-AUV recharging market forced heavy reliance on estimates of realistic model parameters. When possible, model inputs were derived from reported information, but in some cases the inputs represent our best estimate without independent substantiation. The financial model is based on a scenario where our company designs and produces a single type of heaving wave energy convertor that is sold to an AUV recharging platform manufacturer to incorporate onto an open-ocean charging platform. While marketing, sales, and operation of the WEC and charging platform are assumed to be the responsibility of the AUV platform manufacturer and AUV operator, our company does assume responsibility for WEC maintenance and repair costs since repair cost liability is expected to be driving consideration for potential adopters of this unproven technology.
 
The financial model necessitated the creation of a customer demand model to reflect the change in WEC demand in response to changes in WEC power conversion performance and cost. Using a simple approach that assumes these are the only two factors that influence demand, a basic model for demand is given by:
 
<small><math>Unit_\text{ }Demand = (Demand_\text{ }Factor) (Power_\text{ }Generation) - (Cost_\text{ }Factor) (Sales_\text{ }Price)</math></small>
 
where the two different factors relate how much demand is influenced by unit price and WEC power conversion performance. Additional model inputs included:
*WEC efficiency of 12%, which is based on the Pareto front performance for a WEC with a characteristic width of 5m.
*Discount rate of 10%, which is based on a typical rate for a medium risk project.
*A mean time before failure of 0.5 years, which means each system must be repaired twice per year on average. Since these systems are expected to be deployed in remote locations, each repair is expected to cost $20,000 to account for the challenge of sending a repair team to a difficult-to-reach ocean location.
*Total program R&D cost of $20M, all expended during the first 5 years of the project with 10% spent in Year 1, 15% spent in Year 2 & 5, and 30% spent in Year 3 & 4. The magnitude of spending is inferred from limited public reporting of past and present WEC development efforts, while the per-year spread reflects a standard technology development effort. These R&D costs are required to produce an initial commercial product with performance at today's Pareto front. We did not consider federal grants, but these might be available given growing interest in renewable energy and would partially offset development costs.
*Initial production cost of $2M per unit, and initial sales price of $2.1M. We assumed a production learning rate of 5% and a constant sales price over the period.
 
A complete list of baseline model inputs is shown in the table below.


==List of R&T Projects and Prototypes==
{| class="wikitable"
In order to select and prioritize R&D (R&T) projects we recommend using the technical and financial models developed as part of the roadmap to rank-order projects based on an objective set of criteria and analysis. The figure below illustrates how technical models are used to make technology project selections, e.g based on the previously stated 2030 target performance and Figure 8-17 (see the Chapter 8 of the text) shows the outcome if none of the three potential projects are selected.
|-
!Model Parameter !! Value !! Rationale
|-
| Discount Rate [%] || 10% || Moderate Risk Project
|-
| Average wave power density [kW/m] || 20 || Estimated worldwide average
|-
| Characteristic width [m] || 5.0 || Target conversion device size based on company strategic drivers
|-
| Power conversion efficiency [%] || 12% || Expected efficiency for this characteristic width based on technical model
|-
| Power take-off efficiency [%] || 80% || Estimated for linear power take-off technique
|-
| Electricity generation efficiency [%] || 40% || Estimated for hydraulic turbine generator
|-
| Mean time before failure [years] || 0.5 || Estimated
|-
| Repair cost [$1000] || $20 || Estimated
|-
| Starting unit production cost [$1000] || $2,000 || Estimated based on limited reporting for current prototype designs
|-
| Starting sales price [$1000] || $2,100  || Estimated based on production cost value
|-
| Operating life [years] || 5 || Estimated
|-
| Production learning rate [% per year] || 5.0% || Estimated. Large gains expected due to newness of WEC production sector.
|-
| Demand factor [-] || 2 || Estimated
|-
| Cost factor [-] || 0.001 || Estimated
|-
| Annual market growth [% per year] || 10% || Estimated based on Department of Energy market growth projection
|-
| Total R&D cost [$1000] || $20,000 || Estimate based on current reporting for current WEC prototypes
|}


[[File:Section 9.JPG]]
These model inputs result in the plot below, which shows development cost, revenue, repair/maintenance cost, discounted cash flow, and the cumulative discounted cash flow over the 20-year project period. The financial model reveals that while the project begins to generate annual profit in year 6, the project does not generate positive cumulative NPV until year 17. At the end of the 20-year timeline the project has a total NPV of $10.8M.


A roadmap shows the R&T/R&D projects and demonstrators that have been (completed), are being (active) and could be (proposed) undertaken in order to progress the technology at the component or system level towards the set targets/goal set by the higher or lower-level roadmap. Please add what is essentially a Gantt Chart with milestones.


[[File:Section_9_2.JPG]]
[[File:AUV NPV Baseline.PNG|1000px|Financial Model Results in Baseline Case]]


==Key Publications, Presentations and Patents==
A good technology roadmap should contain a comprehensive list of publications, presentations and key patents as shown in Figure 8-19. This includes literature trends, papers published at key conferences and in the trade literature and trade press.


[[File:Section 10 1.JPG]]
The table below shows the detailed free cash flow balance sheet for the baseline case.
 
[[File:AUV NPV.png|1300px|Detailed NPV Calculation for Baseline Case]]
 
===Improved Performance Through R&D Case===
The same financial model was used to calculate the projected monetary benefit of pursuing the technology maturation efforts described in the R&D Projects section of the roadmap. Those projects required increased R&D spending in Year 1-6 and resulted in the following changes to model inputs from the baseline financial case:
*Increased R&D spending by $50M. $20M was distributed evenly in Years 1-3, and $30M was distributed evenly in Years 4-6.
*Power generation efficiency was increased by 5% (to 17%) starting in Year 7 following the completion of the additional R&D. This efficiency increase results in a 5.4kW power generation capability, which is consistent with our company's strategic goal of achieving 5kW of average power production for a device with a 5m characteristic width.
 
The resulting project financial performance and corresponding balance sheet table are shown below.
 
 
[[File:AUV NPV PLOT RD1.PNG|1000px|Financial Model Results in Baseline Case]]
 
 
[[File:AUV NPV RD1.PNG|1300px|Detailed NPV Calculation for Increased R&D Case]]
 
The financial performance plot shows that the additional R&D in Years 1-6 results in worse initial cashflow, but higher cumulative NPV by the time the project concludes due to increased power conversion efficiency increasing power output and resulting in more unit sales. The updated balance sheet that includes the additional R&D projects shows that pursuing the R&D projects is predicted to result in a cumulative NPV of $23.0M, an increase of $12.1M from the baseline case. The increased performance that results from the enhanced R&D scope results in a total sales of 278 WECs over the life of the project, an increase of 101 units from the baseline case. The magnitude of NPV increase from the increased R&D case confirms that the selected additional R&D projects are financially worthwhile.
 
==List of R&D Projects and Prototypes==
===Summary===
In wave power conversion, as described in the technical model, the power output is highly dependent on the state of the waves. In other words, it is highly dependent on changes in the height and period of the waves. The waves' characteristics change with the season, or the time even on the same day. Besides, the characteristics of waves vary greatly from region to region. To recharge the AUVs, a wave power generator needs to be installed in the AUVs' active area. Still, the designed wave generator characteristics are not always optimal for the waves in the region.<br>
With this background, we will focus on an R&D project to achieve greater power output to match the wave characteristics to achieve greater efficiency of Strategic Driver#1. <br>
Wave power is still an immature technology field, with few commercialized and publicly available information. Many WECs mentioned in the "Positioning of Company vs. Competition" section are mostly scaled-down prototypes or mathematical modeling values. Some have been canceled due to failure to obtain funding[https://www.bloomberg.com/news/articles/2013-04-03/wavebob-shuts-down-after-failing-to-raise-funds-find-partner], even though the results were expected. This section will address the technical elements of the projects that are still underway and in which research is being attempted.
 
===R&D Projects and Prototypes===
{| class="wikitable"
|-
!R&D Project !! Strategic Driver  !!  Description!! Relating project
|-
| R&D-1 Design Optimisation || #1 || To optimize the physical design || CETO Project [https://arxiv.org/pdf/2001.08966.pdf]
|-
| R&D-2 Damping (Latching) Optimisation || #1,#2 || To optimize the movement of the WEC in accordance with the wave attributes|| AWS Project [http://www.awsocean.com/projects.html][http://web.ist.utl.pt/duarte.valerio/C2006.pdf], CETO Project[https://www.carnegiece.com/project/ceto-next-gen/], Corpower Ocean Project[https://www.corpowerocean.com/][https://www.diva-portal.org/smash/get/diva2:901716/FULLTEXT02.pdf], WaveBoost Project [https://www.corpowerocean.com/projects/waveboost/]
|}
<br>
====R&D-1 Design Optimisation -CETO Project-====
Demonstrators (TRL5 ->7)<br>
The intention was to optimize for two values of WECs, maximum annual power generation and minimization of the levelised cost of energy (LCoE), to suit the sea area's characteristics (in this case, the Albany test site in Western Australia.) There are the variables used for optimization include buoy radius, height, and damping. For greater maximum annual power generation, the larger the radius and height, the better the result, which is not a useful result concerning cost. For LCoE, the results show that €20.9/MWh can be achieved with optimal design. However, this value doesn’t seem to be realized soon because LCoE for wave energy in 2030 estimated to be between €113-226/MWh.[https://www.irena.org/-/media/Files/IRENA/Agency/Publication/2014/Wave-Energy_V4_web.pdf] and it is said that if LCoE is $120‒470/MWh for wave energy, it can be commercialized.[https://www.energy.gov/sites/prod/files/2019/09/f66/73355-Appendices.pdf] <br>
Note that this study was conducted in imitation of the WEC model called CETO. Although the study was conducted independently of the developer, the results coincide with the next generation CETO (CETO6) parameters that have actually been designed. The development company has also publicly stated that they are optimizing the LCoE in the design of CETO.[https://www.etipocean.eu/assets/Uploads/4-Carnegie-Clean-Energy.pdf]
<br>
 
====R&D-2 Damping (Latching) Optimisation -Corpower Ocean Project-====
Demonstrators (TRL6 ->7)<br>
The period and height of the waves, like the wind, are not constant and vary greatly with the time of day and season. If WEC's range of motion and intensity of damping were held constant, the time available for efficient conversion to power in these changes would be short. There is also a higher risk of failure during storms and other emergencies. To solve these problems and increase the efficiency of power conversion, it is desirable to control the damping characteristics in accordance with the wave conditions.<br>
A related project is Corpower Ocean's WEC. The company achieved a 27% increase in annual power generation and a reduction in LCoE of about 30% in its WaveBoost project, which ended in 2020. The lessons learned will be carried over as Corpower Ocean moves the project to the next step of demonstrating full-scale units.<br>
 
====Project Milestone====
[[File:Milestone5.png|1000px]]<br>
Although research into converting wave energy to power has been conducted since the 1970s, few technologies have achieved commercialization by 2020 due to the complexity and cost. Even Pelamis, which was the world's first offshore wave energy device installed to generate electricity into a national grid in 2004 and was considered the closest to commercialization, went into administration in 2014 due to funding failure. [http://www.emec.org.uk/about-us/wave-clients/pelamis-wave-power/][https://www.bbc.com/news/uk-scotland-scotland-business-30151276]<br>
There are many studies analyzing the method to improve the efficiency of WECs. Many of these studies, however, do not seem to reach full-scale testing. Or they tend to run into financial difficulties before they can be applied to prototypes; for WECs to be commercialized, they need not only academic support from universities and research institutions but also long-term financial support from governments. For example, in 2014, PowerBuoy secured its first offshore commercial order. Since fiscal 2002, a significant portion of their revenues has depended on government agencies. [https://oceanpowertechnologies.gcs-web.com/static-files/d5d7f6de-0a9a-4c51-ba57-14772c034787]<br>
It should be noted that since charging the AUVs is the ultimate goal, the optimal way of charging the AUVs needs to be studied in parallel with improving the efficiency of the WECs.


==Technology Strategy Statement==
==Technology Strategy Statement==
A technology roadmap should conclude and be summarized by both a written statement that summarizes the technology strategy coming out of the roadmap as well as a graphic that shows the key R&D investments, targets and a vision for this technology (and associated product or service) over time. For the 2SEA roadmap the statement could read as follows and is displayed in an Arrow Chart:
'''Our target is to develop a new heaving wave energy converter that can support continuous AUV operations in any ocean environment by 2030.''' To achieve our average electric power target of 5 kW and our size constraint of smaller than 5 m in characteristic dimension, we will invest in two R&D projects. The first is a design optimization project where we optimize physical characteristics of the WEC to maximize power generation and minimize levelised cost of energy with an expected improvement of 2% hydrodynamic efficiency. The second project is a damping optimization project in which we optimize the WEC to adapt to changing ocean conditions with an expected improvement of 3% hydrodynamic efficiency.  By investing approximately $95 million in R&D, we expect to double our NPV.
 


'''Our target is to develop a new solar-powered and electrically-driven UAV as a HAPS service platform with an Entry-into-Service date of 2030. To achieve the target of an endurance of 500 days and useful payload of 10 kg we will invest in two R&D projects. The first is a flight demonstrator with a first flight by 2027 to demonstrate a full-year aloft (365 days) at an equatorial latitude with a payload of 10 kg. The second project is an accelerated development of Li-S batteries with our partner XYZ with a target lifetime performance of 500 charge-discharge cycles by 2027. This is an enabling technology to reach our 2030 technical and business targets.'''
[[File:Swooshupdated.png|Swoosh chart|800px]]


[[File:Section 11.JPG]]
==References==

Latest revision as of 15:09, 30 November 2020


Technology Roadmap Sections and Deliverables

This is a technology roadmap for:

  • 3WEC - Wave Energy Conversion

This is a “Level 3” roadmap, indicating that it addresses a technology at the subsystem level. Higher level roadmaps related to this subject would address technology progression at the market level (AUV Docking Station) and product level (Electricity Generation & Management).

Roadmap Overview

Autonomous underwater vehicles (AUVs) are widely used to make observations and make sense of the ocean without the limitation of requiring a human-in-the-loop to function. Despite advancements in battery and other energy storage technologies, power availability remains a key limiting factor for many AUVs. Power constraints limit payload capabilities, reduce design trade space for key functions like communication and navigation, and restrict the reach of AUVs by reducing mission durations and preventing access to remote areas of the ocean. Despite its austerity, the ocean offers abundant sources of environmental energy in the form of wave energy. In contrast with wind or solar energy, wave energy is always available, which makes it a good candidate for enabling persistent AUV operations.

The figure below shows a notional autonomous maritime system that utilizes each of these energy sources to provide an in-situ power generation capability.

Image of AUV.png

Design Structure Matrix (DSM) Allocation

DSM AUV11.PNG

The 3WEC tree shown above reveals that wave energy conversion (3WEC) is an enabling technology for the Electricity Generation & Management (2PGM) subsystem on an AUV docking station (1ADS). 3WEC technology makes up the 2PGM subsystem along with with energy storage (3STO), electricity generation (3EGN), AUV recharging (3CHG), and power take off (3PTO). Enabling technologies for 3WEC are materials that can withstand the harsh ocean environment for long durations (4SWM), technologies which reduce and prevent biofouling (4BFP), design and operations techniques for adjusting to high energy events like storms (4EWA), and control software (4COS) and hardware (4COH) that optimize wave power conversion across a range of ocean conditions. Some of the 3WEC enabling technologies are shared with other Level 3 technologies, especially those having to do with operation in the ocean environment.

Roadmap Model using OPM

The Object-Process Diagram (OPD) in the figure below shows how the 3WEC technology is related to the AUV docking station, and the broader persistent AUV system that docking station enables. The diagram focuses on the wave energy conversion process for a point absorber type of WEC, which at its most fundamental level relies on wave-induced relative motion between two components to generate a more useful form of energy, such as pneumatic or mechanical. This undergoes a secondary conversion process to generate mechanical rotation, which drives an electricity generator. Electrical energy is stored in a battery and used to recharge a persistent AUV, which has been collecting maritime data of interest in the vicinity of the surface docking station. Figures of merit (FOM) characterizing WEC technology are also shown, as well as the ocean wave characteristics that describe the amount of available wave power. The Object-Process Language (OPL) associated with the OPD is auto-generated and is shown to the right of the OPD. It reflects the same content as the OPD in narrative form.

AUV OPL2.PNG

AUV OPD new.png

Figures of Merit

Wave energy is primarily governed by the following variables:

  • ρ: Water density[kg/m3]
  • g: Acceleration due to gravity [m/s2]
  • h: Wave height [m]
  • Te: Wave period [s]

Wave power is governed by the following equation:

<math>P_{wave} = \frac{\rho g^2 h^2 T_e}{6400 \pi} </math>

The following table shows figures of merit (FOM) that can be used to compare wave energy converters for AUVs. Each FOM provides unique information: specific power offers insight into likely power output when integrated into a host system, conversion efficiency provides information about how much the technology can still be improved before the theoretical maximum is reached, maximum operating duration reveals how readily the technology can support persistent AUV operations, and unit cost provides insight into economic feasibility.


Figure of Merit Units Description
Specific Power [Watts/m] Average power output normalized by characteristic dimension of WEC
Average Power Output [Watts] Average power output of WEC
Characteristic Dimension [m] Size of WEC as it relates to drag
Hydrodynamic Efficiency [%] Fraction of wave energy converted into mechanical energy
Maximum Operating Duration [days] Average number of days WEC can continously harvest energy for
Unit cost [$] Cost of one WEC


The following plot shows improvements in specific power of various wave energy converters. There is not an an obvious trend, although there appears to be some improvement over time. Two qualifications to this chart:

1. By normalizing power by characteristic dimension, we lose some information. Some specific powers appear large because of very small characteristic dimensions and vice versa. 2. The data points in red come from computer modeling of WEC designs, and have not been demonstrated in an ocean environment.

Spec power over time.png

Alignment with Company Strategic Drivers

The following table shows our strategic drivers and the alignment of those drivers with this roadmap.

Number Strategic driver Targets and Alignment
1 Deliver a portable offshore wave energy conversion system with enough capacity to sustain large-class (>500kg) AUV operations. Target: Generate an average of 5kW of electrical power using a device with a maximum characteristic width of 5m.

We expect that a persistent AUV capable of long-duration meaningful maritime data collection will be in the largest class of AUV. The 5m characteristic width constraint was imposed based on an estimate of the largest size of device that could be transported and placed in the ocean environment without specialized equipment. The 5kW power target represents progression beyond the Pareto front for this technology, and is a rough estimation of the power required to continuously sustain two large-class AUVs using a single docking station and WEC. Increasing wave energy conversion efficiency at a deployable size is the focus of this roadmap, therefore this strategic driver is aligned with the technology roadmap.

2 Increase the quantity of data an AUV payload collects by increasing the operating-to-docking duty cycle rate. Target: AUV in collection operations 50% of the time.

For a system comprised of one AUV associated with a single ocean surface docking station, AUV duty cycle depends on the rate of energy generation, the rate that energy can be transferred to an AUV when it is docked for energy replenishing, and the quantity of energy an AUV can store. This roadmap only addresses the rate of docking station power generation. Therefore, this strategic driver is aligned with the technology roadmap, but other technology development is required to fully achieve this strategic driver’s target.

3 To provide a system capable of continuous unattended operation to enable maritime data collection in remote oceanic regions with minimal support infrastructure. Target: 1 year of continuous autonomous operation.

Our roadmap focuses on increasing the efficiency with which wave power can be converted to useful power. This objective will result in the incorporation of new wave energy transfer technologies that are untested over extended operations. Additionally, this roadmap does not address potential maritime-specific failure mechanisms like biofouling or extreme weather. The technology tree and associated DSM shown earlier in the roadmap described how the 4SWM, 4BFP, and 4EWA enabling technologies contribute to other Level 3 technologies adjacent to the 3WEC technology that is the focus of this roadmap. Improving these Level 4 technologies would contribute to increased reliability over a longer operating duration for all aspects of an AUV docking station, as they seek to counter degradation caused by the harsh ocean environment. Therefore, this strategic driver is not aligned with the technology roadmap.

As the table shows, the roadmap for wave energy conversion technology is not sufficient by itself to enable a reliable offshore power source for long-duration unattended AUV maritime data collection operations.

Positioning of Company vs. Competition

There are a wide variety of heaving buoy wave energy converters. The table below summarizes the key data points about each model.


Name Hydrodynamic Efficiency (%) Characteristic Dimension (m) Average Power (kW) Year
Point Absorber 14 125 28 2002
DWP System 20 10 3.2 2002
AquaEnergy 18 6 1.9 2004
INRI/SEADOG 19.25 5.7 1.9 2004
Wavebob 45.5 15 12.8 2004
Small bottom-referenced heaving buoy (SBHB) 3.75 3 .2 2012
Floating two-body heaving converter (FTHC) 29.75 20 15 2012
Bottom-fixed heave-buoy array (BHA) 14.75 5 1.6 2012
Floating heave-buoy array (FHA) 9.75 8 3.2 2012
Two-body heaving device (THD) 25 15 11.6 2012
Lifesaver 12 12.5 3.9 2014
RM3 16 20 11 2013
DEXA 8 22 4.6 2012
Powerbuoy 44 1.5 1.2 2017

Below, we can see two of our FOMs compared graphically. We show two series. The red line shows actual heaving wave energy converter prototypes tested in actual ocean conditions, whereas the blue line shows numerical analysis using modeling equations. The two data series generally agree about the current performance of heaving WECs.

In accordance with strategic driver 1, we want to shift the Pareto front to the top left, where we get more power with a smaller form factor (lower characteristic dimension).

Pareto plot.png

Technical Model

Overview

There are various ways to convert the wave energy, and the amount of energy significantly changes depending on the wave's situation. For simplicity, we divide the model into three parts: 1)the wave energy converter (WEC) part, which converts the wave energy as mechanical, pneumatic, or potential energy, 2)the power take-off (PTO) part, which converts absorbed energy into useful mechanical energy, and 3) the generator, which transforms useful mechanical energy into electrical energy.

Basic process of wave energy conversion<ref>Wave energy conversion and hydrodynamics modeling technologies: A review, Wanan Sheng</ref>

As will be shown later, the wave energy converted by the WEC is determined by the significant wave height and the wave energy period, which vary with the location and season, and the characteristic dimension, which is the length that wave passes. WECs can be broadly classified into the following categories: heaving device, overtopping device, oscillating water device, oscillating wave converter, and others. Each type of WEC includes those whose structures are fixed to the seabed or the shore, floating, and submerged in the water. By adding the secondary and tertiary conversion options to the above information Morphological Matrix and Tradespace are shown as follows. Again, the first two variables have varying expected values depending on location and season, and that the secondary and tertiary conversions are outside the scope of this roadmap.

Morphological Matrix and Tradespace

The image of each WEC type is as follows. The choices shown as ellipses in the matrix correspond to each type.

Illustration of the archetypal wave energy device for each category<ref name="database">A database of capture width ratio of wave energy converters, A.Babarit</ref>

The coefficients affecting the energy conversion efficiency by WEC type differ as follows. In this roadmap, we focus on the mathematical model of the having device to deepen the discussion.

HYDRODYNAMIC EFFICIENCY COEFFICIENTS<ref name="scoping">A Scoping Study to Determine the Location-Specific WEC Threshold Size for Wave-Powered AUV Recharging, Blake P. Driscol, L. Andrew Gish, and Ryan G. Coe</ref>

Mathematical Modeling

Some important variables:

  • B = Characteristic Dimension [m]
  • A = Maximum Horizontal Cross-sectional Area of the WEC device [m^2]
  • H = Significant Wave Hight [m]
  • T = Wave Energy (mean) Period [seconds]
  • η = Hydrodynamic Efficiency [%]
  • ρ = Water Density [kg/m^3] (≈1000 kg/m^3 )
  • g = Gravitational Constant [m/s^2] (≈ 9.81 m/s^2)

Key equations:
Figure7 5.png
Assuming that we use the heaving device, which has a spherical floating device, the power converted by the WEC is given by<ref name="database" />:

key


Also, based on Budal’s limit, the upper theoretical limit for power generation is given by<ref name="scoping" />:

Figure7 7.png

Sensitivity Analysis

図1.png



図2.png

Key Publications and Patents

Key publications and patents are listed below. The listed publications were used to understand current wave energy convertor performance, review modeling methodologies for AUV recharging using wave energy, and determine how this roadmap's technology could be used in a market application. The patents listed represent the first document instance of this type of wave energy conversion technology, as well as several incremental improvement features to increase efficiency and utility.

Publications

  • Babarit, Aurélien. "A database of capture width ratio of wave energy converters." Renewable Energy 80 (2015): 610-628. Executive Summary: Comprehensive compilation of wave energy convertor performance scaled to device characteristic width. Establishes wave energy extraction performance by convertor type and device characteristic width using data regression.
  • Aderinto, Tunde, and Hua Li. "Review on power performance and efficiency of wave energy converters." Energies 12.22 (2019): 4329. Executive Summary: Review and comparison of reported hydrodynamic efficiencies and power performance of wave energy convertors across a range of convertor types and sizes. The analysis concludes that the oscillating body type of wave energy convertor currently has the highest efficiencies, and that efficiency can be further improved by matching the conversion system dynamics to local wave conditions to maximize power output.
  • Driscol, Blake P., L. Andrew Gish, and Ryan G. Coe. "A Scoping Study to Determine the Location-Specific WEC Threshold Size for Wave-Powered AUV Recharging." IEEE Journal of Oceanic Engineering (2020). Executive Summary: Feasibility analysis of wave energy in a AUV recharging application using reported wave energy convertor performance and observed ocean wave energy data. The study concludes there is sufficient available wave energy in the studied locations to support AUV recharging operations using modestly-sized wave energy convertors.
  • LiVecchi, A., et al. "Powering the blue economy; exploring opportunities for marine renewable energy in maritime markets." US Department of Energy, Office of Energy Efficiency and Renewable Energy. Washington, DC (2019): 207. Executive Summary: United States Department of Energy report exploring scientific, military, and commercial markets where marine energy may be uniquely suited to meet market needs. The report explores opportunities and potential applications of one such market—underwater vehicle recharging—which is expected to double by 2022.

Patents

  • Gehre, Max. (1899). US Patent No US628457A. “Device for producing electric currents at sea by the action of waves” available on https://patents.google.com/patent/US628457A. Executive Summary: The first known US patent for a heaving point absorber type of wave energy convertor that generates electricity at the wave site. The simple device uses a simple float to induce electrical current through one-dimensional motion between a series of magnets and an induction coil.
  • Dick, William, (2001). US Patent No US6857266B2. “Wave energy convertor” available on https://patents.google.com/patent/US6857266B2. Executive Summary: The described device is for a typical heaving point absorber type of wave energy convertor that includes the novel feature of being able to variably tune the oscillation device to match the wave period, a key current research area of wave energy conversion technology.
  • Foster, Graham and Stockman, Gareth, (2009). US Patent No US8826658B2. “Wave powered generator” available on https://patents.google.com/patent/US8826658B2. Executive Summary: A patent for a point absorber type of wave energy conversion device that incorporates features that make each convertor more easily transportable, such as an inflatable float and non-rigid connectors between pieces of the device.

Financial Model

Baseline Case

Our project’s financial model calculates the net present value (NPV) of the total project over an assumed 20-year project duration. The lack of public financial information in the wave energy sector coupled with the currently nonexistent wave-energy-for-AUV recharging market forced heavy reliance on estimates of realistic model parameters. When possible, model inputs were derived from reported information, but in some cases the inputs represent our best estimate without independent substantiation. The financial model is based on a scenario where our company designs and produces a single type of heaving wave energy convertor that is sold to an AUV recharging platform manufacturer to incorporate onto an open-ocean charging platform. While marketing, sales, and operation of the WEC and charging platform are assumed to be the responsibility of the AUV platform manufacturer and AUV operator, our company does assume responsibility for WEC maintenance and repair costs since repair cost liability is expected to be driving consideration for potential adopters of this unproven technology.

The financial model necessitated the creation of a customer demand model to reflect the change in WEC demand in response to changes in WEC power conversion performance and cost. Using a simple approach that assumes these are the only two factors that influence demand, a basic model for demand is given by:

<math>Unit_\text{ }Demand = (Demand_\text{ }Factor) (Power_\text{ }Generation) - (Cost_\text{ }Factor) (Sales_\text{ }Price)</math>

where the two different factors relate how much demand is influenced by unit price and WEC power conversion performance. Additional model inputs included:

  • WEC efficiency of 12%, which is based on the Pareto front performance for a WEC with a characteristic width of 5m.
  • Discount rate of 10%, which is based on a typical rate for a medium risk project.
  • A mean time before failure of 0.5 years, which means each system must be repaired twice per year on average. Since these systems are expected to be deployed in remote locations, each repair is expected to cost $20,000 to account for the challenge of sending a repair team to a difficult-to-reach ocean location.
  • Total program R&D cost of $20M, all expended during the first 5 years of the project with 10% spent in Year 1, 15% spent in Year 2 & 5, and 30% spent in Year 3 & 4. The magnitude of spending is inferred from limited public reporting of past and present WEC development efforts, while the per-year spread reflects a standard technology development effort. These R&D costs are required to produce an initial commercial product with performance at today's Pareto front. We did not consider federal grants, but these might be available given growing interest in renewable energy and would partially offset development costs.
  • Initial production cost of $2M per unit, and initial sales price of $2.1M. We assumed a production learning rate of 5% and a constant sales price over the period.

A complete list of baseline model inputs is shown in the table below.

Model Parameter Value Rationale
Discount Rate [%] 10% Moderate Risk Project
Average wave power density [kW/m] 20 Estimated worldwide average
Characteristic width [m] 5.0 Target conversion device size based on company strategic drivers
Power conversion efficiency [%] 12% Expected efficiency for this characteristic width based on technical model
Power take-off efficiency [%] 80% Estimated for linear power take-off technique
Electricity generation efficiency [%] 40% Estimated for hydraulic turbine generator
Mean time before failure [years] 0.5 Estimated
Repair cost [$1000] $20 Estimated
Starting unit production cost [$1000] $2,000 Estimated based on limited reporting for current prototype designs
Starting sales price [$1000] $2,100 Estimated based on production cost value
Operating life [years] 5 Estimated
Production learning rate [% per year] 5.0% Estimated. Large gains expected due to newness of WEC production sector.
Demand factor [-] 2 Estimated
Cost factor [-] 0.001 Estimated
Annual market growth [% per year] 10% Estimated based on Department of Energy market growth projection
Total R&D cost [$1000] $20,000 Estimate based on current reporting for current WEC prototypes

These model inputs result in the plot below, which shows development cost, revenue, repair/maintenance cost, discounted cash flow, and the cumulative discounted cash flow over the 20-year project period. The financial model reveals that while the project begins to generate annual profit in year 6, the project does not generate positive cumulative NPV until year 17. At the end of the 20-year timeline the project has a total NPV of $10.8M.


Financial Model Results in Baseline Case


The table below shows the detailed free cash flow balance sheet for the baseline case.

Detailed NPV Calculation for Baseline Case

Improved Performance Through R&D Case

The same financial model was used to calculate the projected monetary benefit of pursuing the technology maturation efforts described in the R&D Projects section of the roadmap. Those projects required increased R&D spending in Year 1-6 and resulted in the following changes to model inputs from the baseline financial case:

  • Increased R&D spending by $50M. $20M was distributed evenly in Years 1-3, and $30M was distributed evenly in Years 4-6.
  • Power generation efficiency was increased by 5% (to 17%) starting in Year 7 following the completion of the additional R&D. This efficiency increase results in a 5.4kW power generation capability, which is consistent with our company's strategic goal of achieving 5kW of average power production for a device with a 5m characteristic width.

The resulting project financial performance and corresponding balance sheet table are shown below.


Financial Model Results in Baseline Case


Detailed NPV Calculation for Increased R&D Case

The financial performance plot shows that the additional R&D in Years 1-6 results in worse initial cashflow, but higher cumulative NPV by the time the project concludes due to increased power conversion efficiency increasing power output and resulting in more unit sales. The updated balance sheet that includes the additional R&D projects shows that pursuing the R&D projects is predicted to result in a cumulative NPV of $23.0M, an increase of $12.1M from the baseline case. The increased performance that results from the enhanced R&D scope results in a total sales of 278 WECs over the life of the project, an increase of 101 units from the baseline case. The magnitude of NPV increase from the increased R&D case confirms that the selected additional R&D projects are financially worthwhile.

List of R&D Projects and Prototypes

Summary

In wave power conversion, as described in the technical model, the power output is highly dependent on the state of the waves. In other words, it is highly dependent on changes in the height and period of the waves. The waves' characteristics change with the season, or the time even on the same day. Besides, the characteristics of waves vary greatly from region to region. To recharge the AUVs, a wave power generator needs to be installed in the AUVs' active area. Still, the designed wave generator characteristics are not always optimal for the waves in the region.
With this background, we will focus on an R&D project to achieve greater power output to match the wave characteristics to achieve greater efficiency of Strategic Driver#1.
Wave power is still an immature technology field, with few commercialized and publicly available information. Many WECs mentioned in the "Positioning of Company vs. Competition" section are mostly scaled-down prototypes or mathematical modeling values. Some have been canceled due to failure to obtain funding[1], even though the results were expected. This section will address the technical elements of the projects that are still underway and in which research is being attempted.

R&D Projects and Prototypes

R&D Project Strategic Driver Description Relating project
R&D-1 Design Optimisation #1 To optimize the physical design CETO Project [2]
R&D-2 Damping (Latching) Optimisation #1,#2 To optimize the movement of the WEC in accordance with the wave attributes AWS Project [3][4], CETO Project[5], Corpower Ocean Project[6][7], WaveBoost Project [8]


R&D-1 Design Optimisation -CETO Project-

Demonstrators (TRL5 ->7)
The intention was to optimize for two values of WECs, maximum annual power generation and minimization of the levelised cost of energy (LCoE), to suit the sea area's characteristics (in this case, the Albany test site in Western Australia.) There are the variables used for optimization include buoy radius, height, and damping. For greater maximum annual power generation, the larger the radius and height, the better the result, which is not a useful result concerning cost. For LCoE, the results show that €20.9/MWh can be achieved with optimal design. However, this value doesn’t seem to be realized soon because LCoE for wave energy in 2030 estimated to be between €113-226/MWh.[9] and it is said that if LCoE is $120‒470/MWh for wave energy, it can be commercialized.[10]
Note that this study was conducted in imitation of the WEC model called CETO. Although the study was conducted independently of the developer, the results coincide with the next generation CETO (CETO6) parameters that have actually been designed. The development company has also publicly stated that they are optimizing the LCoE in the design of CETO.[11]

R&D-2 Damping (Latching) Optimisation -Corpower Ocean Project-

Demonstrators (TRL6 ->7)
The period and height of the waves, like the wind, are not constant and vary greatly with the time of day and season. If WEC's range of motion and intensity of damping were held constant, the time available for efficient conversion to power in these changes would be short. There is also a higher risk of failure during storms and other emergencies. To solve these problems and increase the efficiency of power conversion, it is desirable to control the damping characteristics in accordance with the wave conditions.
A related project is Corpower Ocean's WEC. The company achieved a 27% increase in annual power generation and a reduction in LCoE of about 30% in its WaveBoost project, which ended in 2020. The lessons learned will be carried over as Corpower Ocean moves the project to the next step of demonstrating full-scale units.

Project Milestone

Milestone5.png
Although research into converting wave energy to power has been conducted since the 1970s, few technologies have achieved commercialization by 2020 due to the complexity and cost. Even Pelamis, which was the world's first offshore wave energy device installed to generate electricity into a national grid in 2004 and was considered the closest to commercialization, went into administration in 2014 due to funding failure. [12][13]
There are many studies analyzing the method to improve the efficiency of WECs. Many of these studies, however, do not seem to reach full-scale testing. Or they tend to run into financial difficulties before they can be applied to prototypes; for WECs to be commercialized, they need not only academic support from universities and research institutions but also long-term financial support from governments. For example, in 2014, PowerBuoy secured its first offshore commercial order. Since fiscal 2002, a significant portion of their revenues has depended on government agencies. [14]
It should be noted that since charging the AUVs is the ultimate goal, the optimal way of charging the AUVs needs to be studied in parallel with improving the efficiency of the WECs.

Technology Strategy Statement

Our target is to develop a new heaving wave energy converter that can support continuous AUV operations in any ocean environment by 2030. To achieve our average electric power target of 5 kW and our size constraint of smaller than 5 m in characteristic dimension, we will invest in two R&D projects. The first is a design optimization project where we optimize physical characteristics of the WEC to maximize power generation and minimize levelised cost of energy with an expected improvement of 2% hydrodynamic efficiency. The second project is a damping optimization project in which we optimize the WEC to adapt to changing ocean conditions with an expected improvement of 3% hydrodynamic efficiency. By investing approximately $95 million in R&D, we expect to double our NPV.


Swoosh chart