Difference between revisions of "Autonomous Mobile Robots"

From MIT Technology Roadmapping
Jump to navigation Jump to search
Line 23: Line 23:
| Continuous Operation Time || [hrs] || Total time the AMR can operate in one full charge
| Continuous Operation Time || [hrs] || Total time the AMR can operate in one full charge
|-
|-
| Picking Rate || [units / hr] || Number of units the AMR can assist the  
| Picking Rate || [units / hr] || Number of units the AMR can assist the picker to pick per hour
|-
|-
| Failure Rate || [times/ hr] || xx
| Failure Rate || [times/ hr] || Number of times the AMR fails per hour
|-
|-
| Learning Time || [hrs] || xx
| Learning Time || [hrs] || Total time it takes to train the AMR to operate in a warehouse
|-
|-
|}
|}

Revision as of 21:11, 9 October 2024

Roadmap Overview

Design Structure Matrix (DSM) Allocation

3AMR DSM v01.png     3AMR tree v01.png

Roadmap Model using OPM

File:3AMR OPM v01.jpeg

Figures of Merit (FOM)

Figure of Merit (FOM) Unit Description
Payload Capacity [kg] Total weight the AMR can carry (including items and shelves)
Speed [m/s] Average speed of the AMR while carrying shelves inside the warehouse
Volume [m^3] Volume of AMR (width x length x height)
Continuous Operation Time [hrs] Total time the AMR can operate in one full charge
Picking Rate [units / hr] Number of units the AMR can assist the picker to pick per hour
Failure Rate [times/ hr] Number of times the AMR fails per hour
Learning Time [hrs] Total time it takes to train the AMR to operate in a warehouse