Kanban Board Template

From MIT Technology Roadmapping
Jump to navigation Jump to search

16.89 MIT Kanban Board

Program Backlog Program Level Waiting In progress Complete Accepted Done
  • Deliverables
  • Roles
  • As the system Architect, what are the most important decisions to define the architectures
  • As the system architect, I need to know the energy requirements (delta-v)) in the Earth-Moon system
  • As a team member in 16.89/ISD 339, I want to schedule a 3hr working session (EM)
  • As a student, I want to read about prior Lunar mission studies (JM)
  • As a team member, I want to have an XLP account (AB)

Schedule and Progress

  • Class Schedule
  • Burndown Chart


Agile Team Level

  • Members
  • Velocity



Open source Kanban Board tool: https://kanboard.org/


SAFe 4.0 Methodology

At the Program Level the following individuals will support the class:

  • Customer: Prof. Jeff Hoffman and a small group of experienced space systems engineers
  • Business Owner: Prof. Olivier de Weck
  • System Architect: Prof. Ed Crawley
  • Product Manager: Axel Garcia
  • There will be no Release Train Engineer (RTE)

At the Team Level the following individuals will support the class:

  • Product Owner: Student Leader responsible for the deliverables (can switch between sprints)
  • Scrum Master: Student Leader responsible for managing each sprint (can switch between sprints)
  • Agile Team: Student contributors to the deliverables

File:SAFe.jpg